Revision history of "URBAN HOTEL — ENERGY EFFICIENCY AND FUNCTIONAL RECOVERY" (Q2076012)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 19:3519:35, 8 October 2024DG Regio talk contribs 48,462 bytes +35 Set a claim value: summary (P836): A intervenção implica trabalhos de restauração da eficiência energética e da eficiência energética do edifício denominado «Hotel dos Cidadãos», que foi concebido para proporcionar uma receção temporária aos residentes gravemente marginalizados. O principal objectivo do projecto consiste em melhorar a qualidade arquitectónica da estrutura através de intervenções em superfícies opacas (paredes perimetrais e solais), da substituição de quadros de janel...

22 March 2024

14 June 2023

10 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 16:3916:39, 5 July 2022DG Regio talk contribs 45,307 bytes +29,284 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

12 February 2022

10 February 2022

9 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

17 July 2020

9 June 2020

24 March 2020

23 March 2020

  • curprev 10:1810:18, 23 March 2020DG Regio talk contribs 8,797 bytes +873 Created claim: summary (P836): THE INTERVENTION INVOLVES WORKS TO RESTORE ENERGY EFFICIENCY AND ENERGY EFFICIENCY OF THE BUILDING CALLED THE ‘CITIZEN’S HOTEL’, WHICH IS DESIGNED TO PROVIDE A TEMPORARY RECEPTION AT NIGHT OF RESIDENTS WHO ARE SERIOUSLY MARGINALISED. THE MAIN OBJECTIVE OF THE PROJECT IS TO IMPROVE THE ARCHITECTURAL QUALITY OF THE STRUCTURE THROUGH INTERVENTIONS ON OPAQUE SURFACES (PERIMETER WALLS AND SOLAI), THE REPLACEMENT OF EXTERNAL WINDOW FRAMES AND MEASURES...

20 March 2020

17 March 2020

12 March 2020

7 March 2020