Revision history of "MANUFACTURING: TMG — INNOVATING TO COMPETE" (Q2075816)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 16:3616:36, 7 October 2024DG Regio talk contribs 59,085 bytes +8 Changed label, description and/or aliases in pt
  • curprev 16:3616:36, 7 October 2024DG Regio talk contribs 59,077 bytes +34 Set a claim value: summary (P836): Neste projeto, a T.M.G. SRL, no ano seguinte, instalou-se a instalação de um novo CED (centro de dados), que foi «integrado no edifício existente». As instalações do DCE serão totalmente construídas em paredes de alumínio e equipadas com todos os sistemas de segurança necessários para a boa manutenção dos servidores, grades para telefonia, suíça, deteção de novas presenças e sistema de controlo de acesso. A partir do centro do centro, a rede de dire...

7 March 2024

14 June 2023

10 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 16:3516:35, 5 July 2022DG Regio talk contribs 55,913 bytes +37,340 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

10 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

17 July 2020

9 June 2020

24 March 2020

  • curprev 17:5417:54, 24 March 2020DG Regio talk contribs 10,092 bytes +433 Changed an Item
  • curprev 16:1916:19, 24 March 2020DG Regio talk contribs 9,659 bytes +1,320 Created claim: summary (P836): IN THIS PROJECT T.M.G. SRL, BY NEXT YEAR, THE INSTALLATION OF A NEW CED (DATA CENTRE), WHICH WAS ‘INTEGRATED WITH THE EXISTING BUILDING’, WAS INSTALLED. THE PREMISES OF THE CED WILL BE FULLY BUILT IN ALUMINIUM WALLS AND EQUIPPED WITH ALL THE SAFETY SYSTEMS REQUIRED FOR THE GOOD MAINTENANCE OF SERVERS, RACKS FOR TELEPHONY, SWICH, NEW PRESENCE DETECTION AND ACCESS CONTROL SYSTEM. BEGINNING AT THE CENTRE OF THE CENTRE, THE INTERNAL WIRING NETWORK H...

18 March 2020

12 March 2020

7 March 2020