Revision history of "WORKS TO COMPLETE THE PROJECT TO REFURBISH — HOTEL EMPIRE" (Q2075393)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:4806:48, 9 October 2024DG Regio talk contribs 46,453 bytes 0 Changed label, description and/or aliases in pt
  • curprev 06:4806:48, 9 October 2024DG Regio talk contribs 46,453 bytes +28 Set a claim value: summary (P836): O PROJECTO DE REESTRUTURAR O IMPÉRIO DO HOTEL DE IMPÉRIO, PARA ALÉM DA ADAPTAÇÃO E RENOVAÇÃO DAS INSTALAÇÕES E SERVIÇOS DO HOTEL À CATEGORIA DE 4 ESTAR, DA UTILIZAÇÃO DE CRITÉRIOS DE SUSTENTABILIDADE ENERGÉTICA E AMBIENTAL E DA REPARAÇÃO DOS BARROS ARQUITECTURAIS, OBJECTIVOS DE FORNECER UMA ESTRUTURA A FORNECER COM SERVIÇOS DESTINADOS A OBJECTIVOS ESPECÍFICOS. O objetivo deste investimento é concluir o projeto de reconstrução e reabilitação iniciado.

7 March 2024

10 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 16:2816:28, 5 July 2022DG Regio talk contribs 43,817 bytes +28,208 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

10 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

17 July 2020

9 June 2020

24 March 2020

23 March 2020

  • curprev 10:0610:06, 23 March 2020DG Regio talk contribs 8,682 bytes +828 Created claim: summary (P836): THE PROJECT TO RESTRUCTURE THE EMPIRE OF THE EMPIRE HOTEL, IN ADDITION TO ADAPTING AND RENEWING THE FACILITIES AND SERVICES OF THE HOTEL TO THE 4-STAR CATEGORY, TO USE CRITERIA FOR ENERGY AND ENVIRONMENTAL SUSTAINABILITY AND TO BREAK DOWN THE ARCHITECTURAL BARRIERS, AIMS TO PROVIDE A STRUCTURE TO BE PROVIDED WITH SERVICES TARGETED AT SPECIFIC TARGETS. THE PURPOSE OF THIS INVESTMENT IS TO COMPLETE THE PROJECT OF RE-BUILDING AND REHABILITATION STA...

17 March 2020

12 March 2020

7 March 2020