Revision history of "ENERGY EFFICIENCY - Q2074792" (Q2074792)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 17:1917:19, 10 October 2024DG Regio talk contribs 49,548 bytes −2 Changed label, description and/or aliases in pt
  • curprev 17:1917:19, 10 October 2024DG Regio talk contribs 49,550 bytes 0 Set a claim value: summary (P836): Tendo em conta a necessidade simultânea de electricidade e de calor, pretende-se incluir no processo de produção uma unidade de produção de gás metano que produza energia a partir dos 300 KW onde a electricidade é colocada em paralelo no quadro geral de baixa tensão, devendo o calor sob a forma de água quente ser prevenido contra um processo que é agora apenas parcialmente precedido pela recuperação térmica e pela baixa taxa de vapor. Espera-se igua...

7 March 2024

14 June 2023

10 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 16:1716:17, 5 July 2022DG Regio talk contribs 46,428 bytes +29,993 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

10 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

17 July 2020

9 June 2020

24 March 2020

23 March 2020

  • curprev 10:1910:19, 23 March 2020DG Regio talk contribs 8,881 bytes +927 Created claim: summary (P836): IN VIEW OF THE SIMULTANEOUS DEMAND FOR ELECTRICITY AND HEAT, IT IS INTENDED TO INCLUDE IN THE PRODUCTION PROCESS A METHANE GAS COGENERATION PLANT OF POWER OUTPUT OUT OF THE 300 KWE WHERE ELECTRIC IS PLACED IN PARALLEL IN THE GENERAL LOW VOLTAGE FRAMEWORK, WHEREAS HEAT IN THE FORM OF HOT WATER SHOULD BE PREHEATED TO A PROCESS WHICH IS NOW ONLY PARTLY PRE-WARMED BY THERMAL RECOVERY AND FLOW RATE BY STEAM. IT IS ALSO EXPECTED TO INCREASE THE INLET...

18 March 2020

12 March 2020

7 March 2020