Revision history of "REPLACING HYDRAULIC PRESS PRESS WITH ELECTRICAL PRESS REVAMPS OF HIGH EFFICACY LED LIGHTING AND FTV SYSTEM" (Q2074119)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

10 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 16:0316:03, 5 July 2022DG Regio talk contribs 45,365 bytes +28,709 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

10 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

17 July 2020

9 June 2020

24 March 2020

23 March 2020

  • curprev 13:1813:18, 23 March 2020DG Regio talk contribs 9,308 bytes +819 Created claim: summary (P836): TO REDUCE CONSUMPTION IN THE MOULDING DEPARTMENT, THE REPLACEMENT OF A HYDRAULIC PRESS WITH AN ELECTRICAL PRESS OF THE SAME TONNAGE HAS BEEN IDENTIFIED. IN ORDER TO INCREASE THE ILLUMINATION, IT WAS DECIDED TO FULLY REPLACE THE LIGHTING OF THE PRODUCTION AREA BY INSTALLING LED LAMPS WHILE FOR THE CONTAINMENT OF THE ENERGY TAKEN FROM THE GRID AND THE RESULTING REDUCTION IN CO2 EMISSIONS THE INSTALLATION OF 67 KWP OF PV EQUIPMENT IS FORESEEN., Ad...

18 March 2020

12 March 2020

7 March 2020