Revision history of "THE GLASS SECTOR TOWARDS TECHNOLOGICAL AND ENERGY INNOVATION" (Q2073971)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 17:1417:14, 10 October 2024DG Regio talk contribs 50,822 bytes −1 Changed label, description and/or aliases in pt
  • curprev 17:1417:14, 10 October 2024DG Regio talk contribs 50,823 bytes +17 Set a claim value: summary (P836): A principal tarefa do projecto histórico consiste em substituir a farinha de fundição, essencial para a transformação do vidro. A mobília actual, com tecnologia obsoleta e principal componente de energia, é substituída por uma mobília de tecnologia avançada com maior insulamento, um sistema de recuperação de calor para a perda de calor no ar e um queimador optimizado. Além disso, o actual sistema de aquecimento das outras salas, baseado em caldeiras...

23 March 2024

14 June 2023

10 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 16:0016:00, 5 July 2022DG Regio talk contribs 48,198 bytes +30,953 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

10 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

17 July 2020

9 June 2020

24 March 2020

23 March 2020

  • curprev 13:1813:18, 23 March 2020DG Regio talk contribs 9,480 bytes +935 Created claim: summary (P836): THE MAIN TASK OF THE HISTORICAL PROJECT IS TO REPLACE THE MELTING FURNACE, WHICH IS ESSENTIAL FOR THE PROCESSING OF GLASS. THE CURRENT FURNACE, WITH OBSOLETE TECHNOLOGY AND MAIN ENERGY ENERGY COMPONENT, IS REPLACED BY AN ADVANCED TECHNOLOGY FURNACE WITH GREATER INSULATION, A HEAT RECOVERY SYSTEM FOR AIR HEAT DEFAULT AND AN OPTIMISED BURNER. IN ADDITION, THE CURRENT HEATING SYSTEM OF THE OTHER ROOMS, BASED ON ELECTRIC HEAT PUMPS AND GAS BOILER, I...

18 March 2020

12 March 2020

7 March 2020