Revision history of "RESTRUCTURING AND CANT OF DEPENDENCY HOTEL MILAN AND TECHNOLOGICAL INNOVATION" (Q2073933)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 16:3516:35, 7 October 2024DG Regio talk contribs 43,414 bytes +1 Changed label, description and/or aliases in pt
  • curprev 16:3516:35, 7 October 2024DG Regio talk contribs 43,413 bytes −23 Set a claim value: summary (P836): CANT BUILDING HOTEL MILAN MILAN COM UNIDADES DE CASA A UTILIZAR COMO UM SUITE JÚNIOR COMPLETO DE MOBILIÁRIO. RENOVAÇÃO DA HABITAÇÃO N.03 A UTILIZAR EM MATÉRIA DE DEPENDÊNCIA. CONSTRUÇÃO DE UM NOVO LIFT COM DEMOLIÇÃO E RECONSTRUÇÃO DA ESCALA. SUBSTITUIÇÃO DE EQUIPAMENTOS E EQUIPAMENTOS DE MILAN DE HOTEL

12 March 2024

14 June 2023

10 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 15:5915:59, 5 July 2022DG Regio talk contribs 40,828 bytes +25,436 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

10 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

17 July 2020

9 June 2020

24 March 2020

23 March 2020

  • curprev 10:0310:03, 23 March 2020DG Regio talk contribs 8,937 bytes +663 Created claim: summary (P836): CANT BUILDING HOTEL MILAN MILAN WITH HOUSING UNITS TO BE USED AS A COMPLETE JUNIOR SUITE OF FURNITURE. RENOVATION OF N.03 HOUSING TO BE USED FOR DEPENDENCY. CONSTRUCTION OF A NEW LIFT WITH DEMOLITION AND RECONSTRUCTION OF SCALE. REPLACEMENT OF EQUIPMENT AND FITTINGS OF HOTEL MILAN MILAN, Adding English summary

17 March 2020

12 March 2020

7 March 2020