Revision history of "ENERGY UPGRADING OF THE CAPITAL OF THE CAPITAL OF THE CAPITAL" (Q2073573)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:4606:46, 9 October 2024DG Regio talk contribs 42,457 bytes −1 Changed label, description and/or aliases in pt
  • curprev 06:4606:46, 9 October 2024DG Regio talk contribs 42,458 bytes +6 Set a claim value: summary (P836): ELABORAÇÃO ENERGÉTICA DO CAPITAL DO CAPITAL DO CAPITAL: REDE DE AQUECIMENTO DISTRITO EXISTENTE, CALENDÁRIO DE RECUPERAÇÃO DE CALOR, RECUPERAÇÃO DE CALOR DA INSTALAÇÃO DE BIOGAS, INSULAÇÃO DA CASCA DE PAREDES DE OITAS OBJETIVOS, INSULAÇÃO TÉRMICA COBERTA, SUBSTITUIÇÃO DE FRAMES DE VIDRO, SUBSTITUIÇÃO DE LUZES E NOVOS LEDS.

7 March 2024

14 June 2023

10 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 15:5215:52, 5 July 2022DG Regio talk contribs 39,844 bytes +24,778 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

10 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

17 July 2020

9 June 2020

24 March 2020

23 March 2020

  • curprev 10:3110:31, 23 March 2020DG Regio talk contribs 8,868 bytes +668 Created claim: summary (P836): ENERGY UPGRADING OF THE CAPITAL OF THE CAPITAL OF THE CAPITAL: EXISTING DISTRICT HEATING NETWORK, HEAT RECOVERY BOILER, HEAT RECOVERY OF THE BIOGAS PLANT, INSULATION OF THE SHELL OF EIGHT EDGE WALLS, THERMAL INSULATION COVERING, REPLACEMENT OF WINDOW FRAMES, REPLACEMENT OF LIGHTS AND NEW LEDS., Adding English summary

20 March 2020

17 March 2020

12 March 2020

7 March 2020