Revision history of "ENERGY UPGRADING OF THE MATERIAL ATTACHED TO THE LOWER SECONDARY SCHOOL OF MASSANZAGO (PD)" (Q2072827)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

22 March 2024

10 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 15:3715:37, 5 July 2022DG Regio talk contribs 39,042 bytes +24,062 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

10 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

17 July 2020

9 June 2020

24 March 2020

23 March 2020

  • curprev 10:3110:31, 23 March 2020DG Regio talk contribs 8,834 bytes +615 Created claim: summary (P836): THE INTERVENTION CONSISTS OF INSULATING THE OUTER EDGE WALLS (INSULATION OF THE OUTER FRAME), THERMAL INSULATION OF THE COVERAGE AND REPLACEMENT OF PART OF THE BUILDING AND REPLACEMENT OF THE EXISTING ILLUMINATING BODIES, WITH NEW LED UNITS., Adding English summary

20 March 2020

17 March 2020

12 March 2020

7 March 2020