Revision history of "DESIGN AND CONTROL OF PRODUCTION" (Q2072419)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

14 June 2023

12 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 15:3015:30, 5 July 2022DG Regio talk contribs 52,803 bytes +34,742 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

16 July 2020

9 June 2020

25 March 2020

  • curprev 00:3400:34, 25 March 2020DG Regio talk contribs 9,991 bytes +1,184 Created claim: summary (P836): THE AIM OF THE PROPOSED PROJECT IS TO SET UP A SYSTEM OF PRODUCTION CONTROL AND PLANNING. THIS AIM IS TO ENSURE THAT THE PRODUCTION PLANNING SYSTEM PLAYS A KEY ROLE IN CONNECTING CUSTOMERS AND THE PRODUCTION SYSTEM, AND TO ENSURE THAT EXISTING PRODUCTION RESOURCES, TAKING ACCOUNT OF THEIR LIMITS AND CONSTRAINTS, ARE BEING EXPLOITED IN AN INTEGRAL WAY, TAKING ACCOUNT OF THEIR LIMITS AND CONSTRAINTS, AND THAT THE PRODUCTION PLANNING SYSTEM IS AN E...

24 March 2020

19 March 2020

12 March 2020

7 March 2020