Revision history of "CENTRE OF EXCELLENCE FOR AUTOMOTIVE" (Q2072343)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:4606:46, 9 October 2024DG Regio talk contribs 59,950 bytes −10 Changed label, description and/or aliases in pt
  • curprev 06:4606:46, 9 October 2024DG Regio talk contribs 59,960 bytes +18 Set a claim value: summary (P836): O PROJETO PREVISTA A EXTENSÃO DA EXTENSÃO DOS SERVIÇOS DE MOTORES DE PÓDIO, COMPLEMENTANDO A Oferta EXISTENTE DE SERVIÇOS DE CONSULTA COM A SUA CAPACIDADE EXISTENTE PARA REALIZAR PROTOTIPOS DE VEÍCULOS, SISTEMAS E SUBSISTEMAS AUTOMÓVEIS (CONVENCIONAIS, HÍBRIDOS E ELÉCTRICOS), ATRAVÉS DE UM FLUXO DE TRABALHO COMPLETO, CONSTANTES DAS SEGUINTES FASE: 1. PARTES DE CONSTRUÇÃO: Farão parte de um CENTRO DE ENSAIO NUMÉRICO (CNC) com 5 EIXOS DE ÚLTIMA GERAÇÃ...

12 March 2024

14 June 2023

12 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 15:2915:29, 5 July 2022DG Regio talk contribs 56,820 bytes +38,173 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

16 July 2020

9 June 2020

24 March 2020

23 March 2020

  • curprev 13:0013:00, 23 March 2020DG Regio talk contribs 9,739 bytes +1,365 Created claim: summary (P836): THE DRAFT PROVIDES FOR THE EXTENSION OF THE EXTENSION OF THE SERVICES OF PODIUM ENGINEERING, BY SUPPLEMENTING THE EXISTING OFFER OF CONSULTANCY SERVICES WITH ITS EXISTING CAPACITY TO CARRY OUT PROTOTYPES OF VEHICLES, SYSTEMS AND SUB-SYSTEMS AUTOMOTIVE (CONVENTIONAL, HYBRID AND ELECTRIC), THROUGH A FULL WORKFLOW, CONSISTING OF THE FOLLOWING STAGES: 1.CONSTRUCTION PARTS: THEY WILL BE PART OF A NUMERICAL TEST CENTRE (CNC) WITH 5 AXES OF LAST GENERA...

18 March 2020

12 March 2020

7 March 2020