Revision history of "PURCHASE OF INNOVATIVE MULTI-ENGINEERING MACHINERY WITH AN INTEGRATED INDUSTRY SYSTEM 4.0" (Q2072320)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:4606:46, 9 October 2024DG Regio talk contribs 51,117 bytes +5 Changed label, description and/or aliases in pt
  • curprev 06:4606:46, 9 October 2024DG Regio talk contribs 51,112 bytes +12 Set a claim value: summary (P836): AQUISIÇÃO DE UMA MÁQUINA INOVADORA PARA TRABALHO MECÂNICO COMPLEXO. O Ê é constituído por um centro de viragem, o BI-MANDRINO «MAZAK INTERGURIX I200S», com um centro de moagem integrado «MAZAK INTERGURIX I5S», com cabeça de moagem integrada para eixos, armazém para 72 ferramentas de viragem e de moagem, e acabamento por exaustão, com carga de barro ou de carga, com suporte ou cartão «SERVIÇO DE CARGA RÁPIDA 3», totalmente gerido para o planeamento...

12 March 2024

14 June 2023

12 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 15:2915:29, 5 July 2022DG Regio talk contribs 47,978 bytes +31,601 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

16 July 2020

9 June 2020

24 March 2020

23 March 2020

  • curprev 13:0013:00, 23 March 2020DG Regio talk contribs 9,021 bytes +970 Created claim: summary (P836): PURCHASE OF AN INNOVATIVE MACHINE FOR COMPLEX MECHANICAL WORK. THE Ê CONSISTING OF A TURNING CENTRE, BI-MANDRINO ‘MAZAK INTERGURIX I200S’ WITH AN INTEGRATED MILLING CENTRE ‘MAZAK INTERGURIX I5S’ WITH AN INTEGRATED MILLING HEAD FOR AXLES, WAREHOUSE FOR 72 TURNING AND MILLING TOOLS, AND FINISHED EXHAUST, WITH BAR OR CORD LOADING, WITH BARS OR CORD ‘LNS QUICK LOAD SERVICE 3’, WHICH IS ENTIRELY MANAGED FOR THE PLANNING BY A REMOTELY SMOTH CAM SYSTE...

18 March 2020

12 March 2020

7 March 2020