Revision history of "(A19_093_2016_0930114_1116) ICAR" (Q2066520)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 June 2023

10 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 14:3314:33, 5 July 2022DG Regio talk contribs 40,014 bytes +24,883 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

16 July 2020

9 June 2020

24 March 2020

  • curprev 23:5923:59, 24 March 2020DG Regio talk contribs 9,303 bytes +680 Created claim: summary (P836): DOES THE PROPOSED EFFICIENCY MEASURE INCLUDE THE INSTALLATION OF THE FOLLOWING COGENERATION PLANT CONSISTING OF: — NO. 3 COGENERATION MODULES, ATRON, MODEL E20/43 OF NOMINAL ELECTRICAL POWER OF 20 KWE AND A RATED HEAT OUTPUT OF 43 KWT, OVERALL GENERATION EFFICIENCY OF 97 %, FUELLED BY NATURAL GAS MAINS, Adding English summary
  • curprev 16:2116:21, 24 March 2020DG Regio talk contribs 8,623 bytes +433 Changed an Item

19 March 2020

12 March 2020

7 March 2020