Revision history of "(A19_093_2016_0930069_1068) CAPACNONE1" (Q2066492)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 June 2023

10 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 14:3314:33, 5 July 2022DG Regio talk contribs 56,425 bytes +37,315 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

16 July 2020

9 June 2020

25 March 2020

  • curprev 10:1010:10, 25 March 2020DG Regio talk contribs 10,627 bytes +1,343 Created claim: summary (P836): INSTALLATION OF NEW LED LAMPS INCORPORATING IN EACH LAMP THE SENSORS (PRESENCE AND DAYLIGHT) AND CONTROL LOGIC FOR INTELLIGENT AUTOMATION AND CONTROL SYSTEMS FOR LIGHTING?. THIS INSTALLATION INCLUDES THE ASSEMBLY OF 53 LED DIGITAL LED LAMPS DLE-12-ST OF 120W. DOES THIS SYSTEM OF INTELLIGENT LIGHTING NOT ONLY REDUCE CONSUMPTION, BUT RATHER MAKE IT POSSIBLE TO MAXIMISE ENERGY EFFICIENCY, ENABLING WORK TO IMPROVE THE FUNCTIONING OF THE COMPANY? AS...

24 March 2020

19 March 2020

12 March 2020

7 March 2020