Revision history of "(A19_093_2016_0930052_1049) AL.IT.E.E." (Q2066482)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

10 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 14:3214:32, 5 July 2022DG Regio talk contribs 55,498 bytes +36,382 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

16 July 2020

9 June 2020

24 March 2020

  • curprev 16:2116:21, 24 March 2020DG Regio talk contribs 10,604 bytes +433 Changed an Item
  • curprev 16:1816:18, 24 March 2020DG Regio talk contribs 10,171 bytes +1,291 Created claim: summary (P836): THE PROPOSED INTERVENTION, REFERS TO THE COMPLETE REPLACEMENT OF THE STRUCTURE OF COVER FOR THE BUILDING, WHICH IS IN A PRECARIOUS STATE OF MAINTENANCE. AT PRESENT, THE FACTORY AND COVERED MOST BY A WOODEN STRUCTURE, TAVELLE IN BRICK ROOF AND TILES OF MARSILIESI ROOFING TILES, AND PARTLY BY COVER IN ETERNIT COVER PLACED ON A SMALL METAL INVOICE. THE PROPOSED INTERVENTION WILL THEREFORE BE ARTICULATED IN THE FOLLOWING WAY: (1) CONSTRUCTION OF THE...

18 March 2020

12 March 2020

7 March 2020