Revision history of "(A19_093_2016_0930023_1023) COPOENN" (Q2066464)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

10 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 14:3214:32, 5 July 2022DG Regio talk contribs 54,588 bytes +35,813 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

17 July 2020

9 June 2020

24 March 2020

23 March 2020

  • curprev 12:4312:43, 23 March 2020DG Regio talk contribs 10,121 bytes +1,222 Created claim: summary (P836): 2A) REPLACEMENT OF WINDOW AND WINDOW FRAMES: AT PRESENT, THE FIXTURES ARE MADE OF BLACK ANODITISED ALUMINIUM AND ONLY SAFETY GLASS. CURRENT TRANSMITTANCE OF CURRENT FIXTURES 6 W/MQK; TRANSMITTANCE OF PROJECT FIXTURES 1,7 W/MQK. THE REPLACING WINDOWS WILL BE MADE OF ALUMINIUM ALLOY EN W 6060 (EN 573-3 AND EN 755-2) WITH FRAMES FIXED AND THE OPENING DOORS MADE FROM THERMAL BRIDGES TO THREE CHAMBERS (INTERNAL AND EXTERNAL TUBES, CONNECTED WITH POLY...

18 March 2020

12 March 2020

7 March 2020