Revision history of "(A19_093_2016_0930019_1018) REC" (Q2066458)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

10 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 14:3214:32, 5 July 2022DG Regio talk contribs 55,042 bytes +35,998 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

16 July 2020

9 June 2020

24 March 2020

  • curprev 16:2016:20, 24 March 2020DG Regio talk contribs 10,608 bytes +433 Changed an Item
  • curprev 16:1816:18, 24 March 2020DG Regio talk contribs 10,175 bytes +1,318 Created claim: summary (P836): THE PROJECT CONSISTS OF THE THERMAL INSULATION OF EXISTING CAPS DELIMITING CERTAIN PARTS OF THE BUILDING TO THE OUTSIDE. IN PARTICULAR, THE INTERVENTION WILL COVER THE ENTIRE AREA USED FOR PRODUCTION, ASSEMBLY AND FINISHING, IN ADDITION TO THE PLACE OF HIDES AND VEGETABLES, AND, IN ADDITION TO THE STORAGE AREA, JOINT ASSEMBLY AND CUTTING, WHERE MOST OF THE EMPLOYEES OF THE CALZATURMILL ARE EMPLOYED. THE WORK WILL COVER A TOTAL OF APPROXIMATELY 5...

19 March 2020

12 March 2020

7 March 2020