Revision history of "(A19_093_2016_0930012_1011) EE WINDOW" (Q2066450)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

10 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 14:3214:32, 5 July 2022DG Regio talk contribs 54,559 bytes +35,713 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

16 July 2020

9 June 2020

24 March 2020

23 March 2020

  • curprev 10:4110:41, 23 March 2020DG Regio talk contribs 10,167 bytes +1,272 Created claim: summary (P836): THE INTERVENTION INITIALLY FORESEES THE COMPLETE DISMANTLING OF THE 62 HEAT PUMPS AND THE ASSOCIATED TRADITIONAL CIRCULATORS ON THE BUILDING’S COVERAGE. TWO HIGHLY EFFICIENT 363 KWF AND 404 KWT THERMAL HEAT PUMPS EACH WILL BE INSTALLED ON A NEW FLOOR IN THE BUILDING PARKING AREA OF THE BUILDING. THESE MACHINES WILL BE CONNECTED IN PARALLEL WITH THE RUNNING OF AN UNDERGROUND PIPE AND A TWIN (TWINNING) TO TWIN, ONE PER MACHINE, WILL BE CONNECTED T...

17 March 2020

12 March 2020

7 March 2020