Revision history of "(A19_075_2015_0750028_1031) SANLOENZO ENERGY EFFICIENCY" (Q2065890)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 June 2023

10 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 14:2114:21, 5 July 2022DG Regio talk contribs 54,299 bytes +35,383 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

16 July 2020

9 June 2020

24 March 2020

  • curprev 23:5923:59, 24 March 2020DG Regio talk contribs 10,521 bytes +1,192 Created claim: summary (P836): MEASURE 1 (GRINDERS): INSTALLATION OF (INVERTER) POWER ELECTRONICS SYSTEMS FOR AUTOMATIC FREQUENCY ADJUSTMENT AND POWER SUPPLY OF THE POWER INTAKE SYSTEM OF 30 KW TO ADJUST THE FLOW RATE. INSERTION OF OPENING/CLOSING DAMPERS ON THE INTAKE OF THE INDIVIDUAL MACHINE, AS CONTROLLED BY THE SWITCHING ON/OFF OF THE MACHINE. THE INSTALLATION OF FLOW RATE MEASURING DEVICE TO ALLOW FOR THE FREQUENCY OF THE INVERTER TO BE ADJUSTED IN SUCH A WAY AS TO KEEP...
  • curprev 16:1316:13, 24 March 2020DG Regio talk contribs 9,329 bytes +433 Changed an Item

19 March 2020

12 March 2020

7 March 2020