Revision history of "(A19_074_2015_0740091_1044) RIENERCAMP" (Q2065870)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

14 June 2023

10 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 14:2014:20, 5 July 2022DG Regio talk contribs 56,275 bytes +37,145 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

29 December 2020

2 November 2020

16 July 2020

9 June 2020

24 March 2020

23 March 2020

  • curprev 10:4110:41, 23 March 2020DG Regio talk contribs 10,148 bytes +1,260 Created claim: summary (P836): THE ENERGY EFFICIENCY MEASURE IS TO REMOVE ALL THREE EXISTING DIESEL FUEL BOILERS AND TO CLEAN UP THEIR FUEL TANKS AND PRODUCE THE HOT WATER WITH SOLAR COLLECTORS AND HEAT PUMPS. IN ORDER TO DO THIS, A CENTRALISED HOT WATER PRODUCTION PLANT HAS BEEN PUT IN PLACE. THE NEW PLANT FOR THE PRODUCTION OF DOMESTIC HOT WATER TO BE CARRIED OUT IN THE VICINITY OF THE HEALTH SERVICE AND TAKING ADVANTAGE OF THE TECHNICAL ROOM LEFT FREE FROM THE GAS OIL BOIL...

17 March 2020

12 March 2020

7 March 2020