Revision history of "(15988.27102017.119000058) LINS_AMB" (Q2059102)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

5 July 2022

  • curprev 12:1912:19, 5 July 2022DG Regio talk contribs 49,159 bytes +31,319 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

24 September 2020

16 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 10:2510:25, 23 March 2020DG Regio talk contribs 9,188 bytes +1,045 Created claim: summary (P836): THERE WILL BE 2 INTERVENTIONS: 1A) REPLACING THE COVER OF THE WHOLE BUILDING WITH ANOTHER OF BETTER TRANSMITTANCE VALUES, MADE UP OF A METAL-BEARING CARRIER STRUCTURE WITH ALL LAYERS OF METAL WOOL WITH ALL OF THE ABOVE LAYERS OF E GLASS WOOL, TO THE POINT OF DEPARTURE, PLATE OF NATURAL ALUMINIUM WITH POLYURETHANE INSULATOR. 5 (B) INSTALLATION OF PHOTOVOLTAIC FACILITIES OF ABOUT 122 KWP CONNECTED TO THE NETWORK D? BUSINESS USERS FOR OWN CONSUMPTI...

20 March 2020

17 March 2020

12 March 2020

6 March 2020