Revision history of "(15988.27102017.119000023) BELLINI 2018" (Q2059065)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

5 July 2022

  • curprev 12:1912:19, 5 July 2022DG Regio talk contribs 54,834 bytes +35,483 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

24 September 2020

17 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 10:0810:08, 23 March 2020DG Regio talk contribs 9,719 bytes +1,257 Created claim: summary (P836): ACTION 1: THE THERMAL INSULATION OF HORIZONTAL STRUCTURES AND THE OUTER WALLS OF THE OUTER WALLS AND THE BASEMENT IN THE PRODUCTIVE AREA WILL BE LINED WITH BOTH THE INSIDE AND THE OUTSIDE WITH PREFABRICATED SANDWICH PANELS MADE UP OF THERMAL INSULATION, COUPLED WITH GALVANISED STEEL LAMINATIONS AND DIFFERENT FINISHES DEPENDING ON THE USE. THE OUTSIDE WALLS OF THE OFFICES OF THE OFFICES WILL BE COVERED IN THE EXTERNAL PART WITH THE SAME PANELLATU...

17 March 2020

12 March 2020

6 March 2020