Revision history of "ENERGY EFFICIENCY (10360.14072017.115000195)" (Q2057084)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

5 July 2022

  • curprev 11:4711:47, 5 July 2022DG Regio talk contribs 58,162 bytes +38,752 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

15 June 2022

7 February 2022

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

24 September 2020

17 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 10:0710:07, 23 March 2020DG Regio talk contribs 9,838 bytes +1,342 Created claim: summary (P836): INSULATION OF THE HORIZONTAL OPAQUE STRUCTURES OF THE SOLAI HORIZONTAL STRUCTURES IN THE BASEMENT TO THE BASEMENT TO THE BASEMENT FLOOR TO THE FLOOR HEATED ON THE GROUND PLANE, AND THE SLAB OF THE SOLAI DIVISIONS BETWEEN ENVIRONMENTS WHICH ARE HEATED TO A NON-HEATED FLOOR; HORIZONTAL OPAQUE STRUCTURES ARE ALSO INSULATED WITH THE HEATED VOLUME TO THE OUTSIDE. WINDOWS WILL BE REPLACED BY THE USE OF FRAMES WITH LOW EMISSIONS THERMAL CUT AND DOUBLE...

20 March 2020

17 March 2020

12 March 2020

6 March 2020