Revision history of "(10360.14072017.115000190) ENERGY EFFICIENCY IN THE MUNICIPALITY" (Q2057081)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

5 July 2022

  • curprev 11:4711:47, 5 July 2022DG Regio talk contribs 43,406 bytes +27,531 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

24 September 2020

17 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 10:0710:07, 23 March 2020DG Regio talk contribs 8,720 bytes +785 Created claim: summary (P836): L? GLOBAL INTERVENTION INVOLVES INSULATION OF THE OUTER WALLS WITH SHEETS OF 120MM POLYSTYRENE EP100; L? INSTALLATION OF WINDOWS WITH DUAL LOW EMISSION GLASS WITH LOW EMISSION PVC FRAME IN THERMALLY CUT PVC CHW 1.6 KWH/M² SQUARED? K; INSTALLATION OF 2 HEAT PUMPS FOR AIR WATER OF 17 KW FOR WINTER HEATING AND COOLING WITH COP EGT; 4,0, INCLUDING STORAGE TANK AND THE INSTALLATION OF A 70KW CONDENSING BOILER., Adding English summary

17 March 2020

12 March 2020

6 March 2020