Revision history of "(10360.14072017.115000180) PRIMARY AND SECONDARY SCHOOL" (Q2057068)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

5 July 2022

  • curprev 11:4711:47, 5 July 2022DG Regio talk contribs 56,838 bytes +37,545 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

24 September 2020

17 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 10:0710:07, 23 March 2020DG Regio talk contribs 9,744 bytes +1,263 Created claim: summary (P836): LOT 1, OPERATION 1 — CENTRAL THERMAL UPGRADING: REPLACEMENT OF HEAT GENERATOR THERMAL GENERATORS BY MODULAR POWER GENERATING SYSTEM WITH N. 3 CONDENSING BOILERS QN = 276 KW, QNTOT = 828 KW. INSTALLATION OF THERMOSTATIC CONTROL VALVES FOR EMITTER BODIES TO OBTAIN REGULATION FOR THE ENVIRONMENT OF WINTER HEATING. L? INTERVENTION? WHICH IS DESIGNED IN COMPLIANCE WITH THE 26.02.2015 DECREE AND TO APPLY FOR THE AID PROVIDED FOR BY THE INTERMINISTERIA...

20 March 2020

17 March 2020

12 March 2020

6 March 2020