Revision history of "(10360.14072017.115000104) PRIMARY SCHOOL OF VIA MAZZINI" (Q2057015)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

5 July 2022

  • curprev 11:4611:46, 5 July 2022DG Regio talk contribs 57,893 bytes +38,574 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

24 September 2020

17 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 09:5809:58, 23 March 2020DG Regio talk contribs 9,817 bytes +1,331 Created claim: summary (P836): THE PROJECT COVERS A SINGLE BUILDING AND PROVIDES FOR THE IMPLEMENTATION OF N? 2 FUNCTIONAL BATCHES. 1? LOT CONCERNS THE RENOVATION OF THE THERMAL POWER PLANT. THE INTERVENTIONS TO BE CARRIED OUT MAINLY CONCERN THE REPLACEMENT OF THE CURRENT GAS CRANKCASE BOILER WITH A CONDENSING THERMAL GENERATOR, THE EXTERNAL INSTALLATION OF AN INTEGRATED AIR-TO-WATER HEAT PUMP AND A PHOTOVOLTAIC FIELD ON THE GYM COVER. L? SAR? EQUIPPED WITH A RELAXATION ON TH...

20 March 2020

17 March 2020

12 March 2020

6 March 2020