Revision history of "(10360.14072017.115000070) BANTI SCHOOL" (Q2056990)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

5 July 2022

  • curprev 11:4611:46, 5 July 2022DG Regio talk contribs 54,955 bytes +35,907 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

24 September 2020

17 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 09:5809:58, 23 March 2020DG Regio talk contribs 9,642 bytes +1,195 Created claim: summary (P836): THE EXECUTIVE DESIGN INCLUDES THE FOLLOWING ACTIONS TO BE CARRIED OUT IN A SINGLE LOT: 1.COIBENING AND SEALING FLAT COVERS. 12 TO BE PLACED DIRECTLY ON THE SURFACE CURRENTLY EXPOSED TO ATMOSPHERIC AGENTS, AND CARRY OUT METAL SUPPORT FOR THE NEW COVER TO BE MADE IN MULTILAYER STEEL PLATE, THE PACKAGE PROVIDED FOR? .OPTIMUM THERMAL INSULATION] 2.COIBENING FLOOR TRAMAIO (FOR ROOFING) (FOR COVERS EXCLUDED FROM SECTION 1) [FIXED IN A PANELLINO PREMIS...

17 March 2020

12 March 2020

6 March 2020