Revision history of "(10360.14072017.115000061) ANNA FRANK SCHOOL" (Q2056985)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

5 July 2022

  • curprev 11:4611:46, 5 July 2022DG Regio talk contribs 56,058 bytes +36,892 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

10 February 2022

9 February 2022

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

24 September 2020

17 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 09:5809:58, 23 March 2020DG Regio talk contribs 9,734 bytes +1,287 Created claim: summary (P836): DOES THE OPERATION PROVIDE FOR THE REMOVAL OF THE CURRENT THERMAL COMPONENTS AND THE INSTALLATION OF NEW ELMETIS.THERE IS A NEW INSTALLATION OF A NEW HEAT GENERATOR TO MODULAR CONDENSATION OF THE POTENTIALIT? AT THE END OF THE FIRE OF 336 KW, EQUIPPED WITH MODULAR BURNERS THAT WERE PREMIXED TO HIGH YIELDS AND LOW POLLUTING EMISSIONS, TOGETHER WITH A NEW SYSTEM FOR THE EVACUATION OF STAINLESS STEEL COMBUSTION PRODUCTS, SUITABLE FOR CONDENSING BOI...

20 March 2020

17 March 2020

12 March 2020

6 March 2020