Revision history of "(10360.14072017.115000050) ENERGY EFFICIENCY IN THE ENERGY EFFICIENCY OF THE SARROCCHI INSTITUTE" (Q2056970)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

5 July 2022

  • curprev 11:4511:45, 5 July 2022DG Regio talk contribs 57,813 bytes +38,345 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

24 September 2020

17 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 09:5809:58, 23 March 2020DG Regio talk contribs 9,883 bytes +1,333 Created claim: summary (P836): DOES THE PROJECT ENVISAGE IMPROVEMENT MEASURES IN PARTICULAR: INTERVENTON.1: WINDOW FRAMES AND WINDOW FRAMES OF 1.L? OBJECTIVE? TO REDUCE LOSSES BY BRINGING THE TRANSMITTANCE OF WINDOWS INTO UW = 1,5W/M2K AND WINDOWS AT UW = 1,615W/M2K.WERE FURTHER COS? TO SUMMARISE: INSTALLATION OF SCAFFOLDING, WHICH MUST BE ENCLOSED? MEASURE NO 1, DISMANTLING OF FIXTURES AND FITTINGS, REASSEMBLING NEW FIXTURES AND FITTINGS, AND 2: STANDARD HEAT INSULATION OF T...

20 March 2020

17 March 2020

12 March 2020

6 March 2020