Revision history of "(10360.14072017.115000047) MACRO-STRUCTURE 2" (Q2056966)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

5 July 2022

  • curprev 11:4511:45, 5 July 2022DG Regio talk contribs 54,796 bytes +35,552 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

24 September 2020

17 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 09:5809:58, 23 March 2020DG Regio talk contribs 9,708 bytes +1,253 Created claim: summary (P836): ACTION 1: INSULATION OF THE PERIMETER WALLS THE OPERATION PROVIDES FOR THE APPLICATION OF SINTERED POLYSTYRENE FOAM PANELS (EPS,? = 0,033 W/MK, THICKNESS 12 CM). THE THICKNESS CHOSEN ALLOWS THE BUILDING BLOCKS TO ACHIEVE A TRANSMITTANCE OF 0,23 W/M2K, WHICH IS BELOW THE LIMIT LAID DOWN IN THE LEGISLATION IN FORCE. ACTION 2: DO YOU INTEND TO REPLACE THE TRANSPARENTE-SPOT ENVELOPE WHEN REPLACING THE FIXTURES BY OTHER PI? PROOF OF PERFORMANCE, WITH...

17 March 2020

12 March 2020

6 March 2020