Revision history of "(10360.14072017.115000043) SCHOOL PLUS" (Q2056963)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

5 July 2022

  • curprev 11:4511:45, 5 July 2022DG Regio talk contribs 55,170 bytes +36,419 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

24 September 2020

17 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 09:5809:58, 23 March 2020DG Regio talk contribs 9,703 bytes +1,262 Created claim: summary (P836): THE INTERVENTIONS AIM AT IMPROVING THE ENERGY PERFORMANCE AND COMFORT OF THE SCHOOL COMPLEX. IT IS ALSO ASSUMED TO ACHIEVE SIGNIFICANT ECONOMIC SAVINGS IN RELATION TO THE PURCHASE OF METHANE GAS, I.E. THE FUEL POWERING THE POWER PLANT. THE INTERVENTIONS WILL BE DIVIDED INTO TWO HOMOGENEOUS FUNCTIONAL LOTS: ONE RELATING TO THE REPLACEMENT OF THE FIXTURES AND THERMAL INSULATION OF THE SUBSYSTEM, THE OTHER RELATING TO THE REPLACEMENT OF HEAT GENERA...

20 March 2020

17 March 2020

12 March 2020

6 March 2020