Revision history of "(10360.14072017.115000025) ENERGY REFURBISHMENT OF PODENZANA SCHOOLS" (Q2056949)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

5 July 2022

  • curprev 11:4511:45, 5 July 2022DG Regio talk contribs 46,875 bytes +29,890 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

24 September 2020

17 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 09:5809:58, 23 March 2020DG Regio talk contribs 9,063 bytes +929 Created claim: summary (P836): ACTION 1: THERMAL INSULATION OF COVER FOR BOTH FLAT AND INCLINATORIES 2: REPLACEMENT OF THE INPRIMINFORVENTION WINDOW FRAMES 3: REPLACEMENT OF EXISTING BOILER WITH CONDENSING BOILER AND INSERTION OF TEST VALVES ON THE TERMS OF THE 4: ESTABLISHMENT OF A SOLAR THERMAL SYSTEM FOR THE PRODUCTION OF HOT WATER INTEGRATED INTO THE WINTER AIR CONDITIONING SYSTEM INTERVENTION 5: PRODUCTION OF PHOTOVOLTAIC INSTALLATIONS FOR THE PRODUCTION OF ELECTRICITY U...

17 March 2020

12 March 2020

6 March 2020