Revision history of "(10360.14072017.115000006) HIGH PERFORMANCE COGENERATOR CAPOSTAGGIA" (Q2056927)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

5 July 2022

  • curprev 11:4511:45, 5 July 2022DG Regio talk contribs 36,534 bytes +22,153 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

4 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

24 September 2020

17 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 09:5709:57, 23 March 2020DG Regio talk contribs 8,249 bytes +544 Created claim: summary (P836): CONSTRUCTION OF A COMBINED HEAT AND POWER PLANT AT CAPOSTAGGIA HOSPITAL, LOCATED IN THE MUNICIPALITY OF POGGIBONSITHE OPERATION IS NOT BROKEN DOWN INTO FUNCTIONAL BATCHES, Adding English summary

20 March 2020

17 March 2020

12 March 2020

6 March 2020