Revision history of "228_UNION OF MUNICIPALITIES OF MONTALBO_431_INSTALLATION OF RENEWABLE ELECTRICITY GENERATION INSTALLATIONS INTEGRATED INTO MICRO-GRIDS/SMART GRIDS." (Q2051925)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

6 September 2022

27 August 2022

5 July 2022

  • curprev 10:1910:19, 5 July 2022DG Regio talk contribs 42,829 bytes +27,374 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

29 December 2020

2 November 2020

15 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 09:4909:49, 23 March 2020DG Regio talk contribs 8,615 bytes +674 Created claim: summary (P836): INSTALLATIONS FOR THE PRODUCTION OF RENEWABLE ELECTRICITY INTEGRATED INTO MICRO-GRIDS/SMART GRIDS; INTERFACING WITH BMS; INSTALLING ELECTROCHEMICAL STORAGE SYSTEMS FOR THE REALISATION OF MICRORADIANS; SMART REMOTE CONTROL SYSTEMS BACS AND BMS; INSTALLATION OF RECHARGING POINTS FOR ELECTRIC VEHICLES., Adding English summary

20 March 2020

17 March 2020

12 March 2020

6 March 2020