Revision history of "DEVELOPMENT OF THE REGIONAL MONITORING SYSTEM" (Q2050928)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

27 July 2022

  • curprev 19:5419:54, 27 July 2022DG Regio talk contribs 52,788 bytes +35,534 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

10 February 2022

9 February 2022

8 February 2022

7 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 09:4809:48, 23 March 2020DG Regio talk contribs 9,028 bytes +1,205 Created claim: summary (P836): DISTRIBUTION SYSTEMS OPERATED BY ABBANOA SPA HAVE BEEN THE SUBJECT OF RECENT LOANS GRANTED BY THE COMPANY ABBANOA. CIPE 27/2015 AND DC N.8 OF 10.04.2014, AIMED AT UPGRADING THE WATER NETWORKS BY REPLACING OLD ONES. THE COMPLETION OF ACTIONS TO CONTAIN WATER LOSSES REQUIRES REPLICATION OF THE ACTIVATION OF AN EXTENSIVE NETWORK OF ACTIVE MONITORING AND CONTROL OF THE OPERATION OF NETWORKS AND INSTALLATIONS, WITH THE AIM OF OPTIMISING THE MANAGEMEN...

17 March 2020

12 March 2020

6 March 2020