Revision history of "4COST Â TO MAKE DESIGN TECHNOLOGY FOR SUSTAINABLE MANUFACTURING" (Q2046140)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 19:2619:26, 8 October 2024DG Regio talk contribs 60,912 bytes +12 Changed label, description and/or aliases in pt
  • curprev 19:2619:26, 8 October 2024DG Regio talk contribs 60,900 bytes +33 Set a claim value: summary (P836): O cenário que agora está nas mãos das ex-mulheres é caracterizado pela necessidade de competir nos mercados globais e opor-se ao uso de recursos, onde um fator decisivo é o custo. Hoje em dia, o custo de um sistema, compreendido como produto, linha de produção ou planta, não é gerido de forma ideal, frequentemente calculado por métodos subjetivos e frequentemente avaliado no final do projeto, com a possibilidade limitada de tomar medidas se não esti...

22 March 2024

14 June 2023

10 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 08:5208:52, 5 July 2022DG Regio talk contribs 58,256 bytes +38,399 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

25 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

25 September 2020

17 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 09:4409:44, 23 March 2020DG Regio talk contribs 9,812 bytes +1,325 Created claim: summary (P836): THE SCENARIO THAT NOW STANDS IN THE HANDS OF THE FORMER FIRMS IS CHARACTERISED BY THE NEED TO COMPETE ON GLOBAL MARKETS AND OPTIMISE LÂ 'USE OF RESOURCES, WHERE A DISTINCTIVE FACTOR IS THE COST. TODAY, THE COST OF A SYSTEM, UNDERSTOOD AS A PRODUCT, PRODUCTION LINE OR PLANT, IS NOT MANAGED IN AN OPTIMAL WAY, WHICH IS OFTEN ESTIMATED BY SUBJECTIVE METHODS AND OFTEN ÃS EVALUATED AT THE END OF THE PROJECT, WITH THE LIMITED POSSIBILITY OF TAKING ACTI...

17 March 2020

12 March 2020

6 March 2020