Revision history of "INDUSTRALIA — INNOVATIVE REALITY SURFACE TREATIES FOR CASTING STRUCTURES FOR LOW IRON AL ALLOYS" (Q2044247)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 16:2916:29, 7 October 2024DG Regio talk contribs 47,973 bytes −4 Changed label, description and/or aliases in pt
  • curprev 16:2916:29, 7 October 2024DG Regio talk contribs 47,977 bytes +12 Set a claim value: summary (P836): O PROJETO DE COLABORAÇÃO OBJETO DA OBTENÇÃO DE UM NOVO PRODUTO, INTERCAMBÁVEL PARA NAVIOS CILINDRICOS INTEGRAIS PARA MÁQUINAS ADEQUADAS PARA MATÉRIAS DE FERRO FUNDIDO COM LIGAÇÕES DE BAIXO TEOR DE FERRO CONHECIDAS A SER PARTICULARMENTE AGRESSIVAS NA SUPERFÍCIE INTERIOR DE CILINDRADORES DE AÇO COM UTILIZADA REDUÇÃO DA VIDA DE APROXIMÁVEL DE 10000 A 3000 CICLOS (2-3 DIAS DE TRABALHO). Embora a substituição não seja completa, conduz a um fundamento e a...

23 March 2024

14 June 2023

11 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 08:1908:19, 5 July 2022DG Regio talk contribs 44,843 bytes +28,724 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

9 February 2022

24 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

17 July 2020

8 June 2020

24 March 2020

  • curprev 13:2413:24, 24 March 2020DG Regio talk contribs 9,180 bytes +797 Created claim: summary (P836): THE COLLABORATION PROJECT AIMS AT OBTAINING A NEW PRODUCT, INTERCHANGEABLE FOR INTEGRAL CYLINDRICAL VESSELS FOR SUITABLE DIE-CASTING MACHINES WITH LOW IRON CONTENT ALLOYS KNOWN TO BE PARTICULARLY AGGRESSIVE ON THE INNER SURFACE OF STEEL CYLINDERS WITH A USEFUL LIFE REDUCTION OF APPROXIMATELY 10000 TO 3000 CYCLES (2-3 WORKING DAYS). ALTHOUGH THE REPLACEMENT IS NOT COMPLEX, IT LEADS TO A GROUNDING AND A TRANSIENT TEST OF, Adding English summary
  • curprev 06:5806:58, 24 March 2020DG Regio talk contribs 8,383 bytes +433 Changed an Item

19 March 2020

12 March 2020

6 March 2020