Revision history of "CN NUMERICALLY CONTROLLED PUNCHING" (Q2040911)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 June 2023

11 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 07:1607:16, 5 July 2022DG Regio talk contribs 55,227 bytes +36,581 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

13 June 2022

8 February 2022

24 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

25 September 2020

17 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 13:0613:06, 23 March 2020DG Regio talk contribs 9,177 bytes +1,274 Created claim: summary (P836): THE PROJECT INVOLVES THE PURCHASE OF: 1) CNC PUNCHING MACHINE FOR CNC MOD. AE 2610 FULL NT OF SECURITY SYSTEMS, PRESS KIT, DEDICATED SOFTWARE; (2) COMPLETE AUTOMATIC LOADING AND UNLOADING SYSTEM FOR SAFETY SYSTEMS, PLC, OPERATING TERMINAL; (3) SOLUTION PACK IN CASE OF INTERCONNECTION TO FACTORY COMPUTER SYSTEMS WITH REMOTE LOADING OF INSTRUCTIONS. THE COMPLEX EVOLUTION OF TECHNOLOGY APPLIED TO THE PRODUCTS THROUGH: (A) AN INCREASE IN THELIE OUTP...

18 March 2020

12 March 2020

6 March 2020