Revision history of "NEW LAND COVER SAN FRANCESCO VIA MILITE UNKNOWN, FIRST PART OF THE FIRST LOT, ROP ERDF 2014 2020, INVESTMENT FOR GROWTH AND EMPLOYMENT OBJECTIVE AXIS 5 OT5 OB SPEC 5 1" (Q2040751)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

5 July 2022

  • curprev 07:1307:13, 5 July 2022DG Regio talk contribs 53,411 bytes +35,307 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

24 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

16 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 10:0610:06, 23 March 2020DG Regio talk contribs 9,500 bytes +1,125 Created claim: summary (P836): THE DEFINITIVE PROJECT FOR THE RECONSTRUCTION OF THE TERMINAL COVERAGE OF THE SAN FRANCESCO TORRENT IS PART OF A HYDRAULIC PHYSICAL CONSTRUCTION OF THE RIVER SAN FRANCESCO, FOR WHICH THE TECHNICAL COMMITTEE OF THE BASIN DELIVERED A FAVOURABLE OPINION ON 09/02/2017. THE INTERVENTION CONSISTS OF THE PRODUCTION OF A NEW TOMBLING OF A SINGLE TUBE, A LOWERING OF THE FUND’S SLOPE. IT RESOLVES THE STRUCTURAL WEAKNESSES OF THE CURRENT STRUCTURE. THE FIR...

17 March 2020

12 March 2020

6 March 2020