Revision history of "SCAMAC S.R.L." (Q2036855)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

5 July 2022

  • curprev 05:5905:59, 5 July 2022DG Regio talk contribs 54,312 bytes +35,516 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

9 February 2022

7 February 2022

24 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

16 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 09:0809:08, 23 March 2020DG Regio talk contribs 10,096 bytes +1,298 Created claim: summary (P836): LARGE SECTION AND MEDIUM TUNNELS WHICH ARE DEVELOPING IN SOILS WITH VARIABLE GEOLOGICAL FORMATIONS WHERE BOTH DIFFICULT FORMATIONS, LIMI, OR, IN GENERAL, INCONSISTENT GEOLOGICAL FORMATIONS ARE ENCOUNTERED, ARE SHOWN TO BE HARD OF HARD MEDIUM AND ARE NOW EXCAVATED WITH MACHINES OF FULL TYPE EPB. THESE MACHINES, (SEE HTTPS VIDEO://WWW.HERENKNECHT.COM/EN/PRODUCTS/COR-PRODUCT/TUNNELLING/EPB-SHIELD.HT) HAVE THE CUTTING HEAD EQUIPPED WITH A SET OF...

20 March 2020

17 March 2020

12 March 2020

6 March 2020