Revision history of "CONERING-ACTION 1 ON MANAGEMENT OF PRODUCTION STAGES" (Q2035538)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 17:0517:05, 10 October 2024DG Regio talk contribs 49,146 bytes 0 Changed label, description and/or aliases in pt
  • curprev 17:0517:05, 10 October 2024DG Regio talk contribs 49,146 bytes +33 Set a claim value: summary (P836): VERIFICAR A QUALIDADE DA PRODUÇÃO EM CONFORMIDADE COM OS PROCEDIMENTOS DE UTILIZAÇÃO E GARANTIR QUE O NÍVEL DE QUALIDADE ADEQUADO É RESPEITADO A CADA PRODUTO, GERIR OS DIREITOS DE PRODUÇÃO EM CONFORMIDADE COM OS PARÂMETROS DE EFICÁCIA E EFICÁCIA E AS DISPOSIÇÕES DA EMPRESA; GERIR OS PROBLEMAS RELATIVOS ÀS FASES DE PRODUÇÃO, TOMANDO MEDIDAS PARA OS RESOLVER, DE ACORDO COM AS INSTRUÇÕES DA PESSOA RESPONSÁVEL PELA PRODUÇÃO, O PLANEAMENTO DO FORNECIMENT...

7 March 2024

21 June 2023

11 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 05:2705:27, 5 July 2022DG Regio talk contribs 46,499 bytes +29,670 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

4 February 2022

24 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

16 July 2020

7 June 2020

23 March 2020

  • curprev 13:1613:16, 23 March 2020DG Regio talk contribs 9,815 bytes +929 Created claim: summary (P836): CHECK THE QUALITY OF PRODUCTION IN ACCORDANCE WITH THE PROCEDURES IN USE AND ENSURE THAT THE APPROPRIATE QUALITY LEVEL IS RESPECTED FOR EACH PRODUCT, MANAGE THE PRODUCTION STEPS IN ACCORDANCE WITH EFFICIENCY AND EFFECTIVENESS PARAMETERS AND THE COMPANY’S PROVISIONS; MANAGE THE PROBLEMS RELATING TO THE PRODUCTION STAGES, BY TAKING STEPS TO RESOLVE THEM, IN ACCORDANCE WITH THE INSTRUCTIONS OF THE PERSON RESPONSIBLE FOR PRODUCTION, PLANNING THE SUP...

21 March 2020

18 March 2020

11 March 2020

6 March 2020