Revision history of "ENERGY UPGRADING OF BASIC SCHOOL E. DE AMICIS DI FORGRIA IN FRIULI" (Q2034893)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 16:2416:24, 7 October 2024DG Regio talk contribs 47,260 bytes −2 Changed label, description and/or aliases in pt
  • curprev 16:2416:24, 7 October 2024DG Regio talk contribs 47,262 bytes +3 Set a claim value: summary (P836): O PROJECTO PREVISTA A APLICAÇÃO DE UMA SÉRIE DE MEDIDAS DE EFICIÊNCIA ENERGÉTICA QUE IRÁ INCLUIR NA ESCOLA A CONSTRUÇÃO DE UMA ESTRUTURA DE CONSUMO ENERGÉTICO NERO (NZEBS), A INTERVENÇÃO SERÁ ACOMPANHADA PELA APLICAÇÃO SIMULTÂNEA DE AJUSTAMENTOS ESTRUTURAIS QUE IRÃO INCUMPRIR A CONFORMIDADE COM O EDIFÍCIO ANTI-SEISMICO EXISTENTE. RESUMO: DISPOSIÇÕES RELATIVAS À INSULAÇÃO DOS PAINÉIS PERIMETROS E DO PAVIMENTO, SUBSTITUÍNDO AS FRAMAS METÁLICAS EXISTEN...

23 March 2024

11 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 05:1405:14, 5 July 2022DG Regio talk contribs 44,139 bytes +28,206 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

12 February 2022

10 February 2022

7 February 2022

4 February 2022

24 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 09:1409:14, 23 March 2020DG Regio talk contribs 8,286 bytes +864 Created claim: summary (P836): THE PROJECT PROVIDES FOR THE IMPLEMENTATION OF A SERIES OF ENERGY EFFICIENCY MEASURES WHICH WILL RENDER THE SCHOOL BUILDING A NEARLY ZERO ENERGY CONSUMPTION STRUCTURE (NZEBS), THE INTERVENTION WILL BE ACCOMPANIED BY THE SIMULTANEOUS IMPLEMENTATION OF STRUCTURAL ADJUSTMENTS THAT WILL RENDER IT COMPLIANT WITH THE EXISTING ANTI-SEISMIC BUILDING. IN SUMMARY, PROVISION IS MADE FOR THE INSULATION OF THE PERIMETER WALLS AND THE FLOOR, REPLACING THE EXI...

20 March 2020

17 March 2020

12 March 2020

6 March 2020