Revision history of "LIFE PROJECT" (Q2034583)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 17:0617:06, 10 October 2024DG Regio talk contribs 45,236 bytes +4 Changed label, description and/or aliases in pt
  • curprev 17:0617:06, 10 October 2024DG Regio talk contribs 45,232 bytes −9 Set a claim value: summary (P836): O PROJECTO APLICÁVEL AO SEGUINTE: MEDIDAS PARA MELHORAR UM NOVO SISTEMA DE PRODUÇÃO denominado «PROJETO DE VIDA» ATRAVÉS DOS INVESTIMENTOS NA TECNOLOGIA DA PRODUÇÃO, DO AUMENTO DA PRODUÇÃO DE FLESSIBILIDADE, DO AUMENTO DA PESQUISA POR UMA ILHA SELVAGEM, DA PRESTAÇÃO E LIGAÇÃO DE INSTALAÇÕES TECNOLÓGICAS PARA O FUNCIONAMENTO OPTIMÁTICO DA VIDA E DA OPTIMIZAÇÃO DO PROCESSO, TAMBÉM COMO RESULTADO DE UMA REDISTRIBUIÇÃO DA LEGISLAÇÃO INTERNA EM RESULTADO...

7 March 2024

11 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 05:0605:06, 5 July 2022DG Regio talk contribs 42,112 bytes +26,736 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

12 February 2022

10 February 2022

3 February 2022

24 January 2022

24 December 2021

23 December 2021

16 December 2021

2 November 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 09:1409:14, 23 March 2020DG Regio talk contribs 8,100 bytes +820 Created claim: summary (P836): THE PROJECT COMPRISES THE FOLLOWING: MEASURES TO IMPROVE A NEW PRODUCTION SYSTEM CALLED ‘LIFE PROJECT’ THROUGH INVESTMENTS IN PRODUCTION TECHNOLOGY, THE INCREASE OF FLESSIBILITY PRODUCTION, THE INCREASE IN THE SEARCH BY A WELDING ISLAND, THE PROVISION AND CONNECTION OF TECHNOLOGICAL FACILITIES FOR THE OPTIMUM OPERATION OF THE BLIFE AND THE OPTIMISATION OF THE PROCESS, ALSO AS A RESULT OF A REDISTRIBUTION OF INTERNAL LAYOUT AS A RESULT OF., Addin...

17 March 2020

12 March 2020

6 March 2020