Revision history of "ECE INNOVATIVE PRODUCTION PROCESS (CIPPP)" (Q2033693)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

11 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 04:4704:47, 5 July 2022DG Regio talk contribs 43,522 bytes +27,439 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

15 June 2022

3 February 2022

24 January 2022

24 December 2021

23 December 2021

15 December 2021

2 November 2020

17 July 2020

8 June 2020

24 March 2020

  • curprev 15:0515:05, 24 March 2020DG Regio talk contribs 9,577 bytes +827 Created claim: summary (P836): THE PURPOSE OF THE PROJECT IS TO INTERCONNECT AND INTEGRATE THE NEW PRODUCTION SYSTEM, INTRODUCING LEAN MANUFACTURING, WITH THE AIM OF MAKING THE SYSTEMS A-FILIERA-AZIENDA CAPABLE OF PRODUCING NEW AND TECHNOLOGICALLY ADVANCED PRODUCTS IN A LIGHT, ON A CONTRACT BASIS, WITH SECURE/SMART HANDLING WITH PIUÂ’EVOLVED PRODUCTS, AN INNOVATIVE DESIGN SOFTWARE THAT IS INTERCONNECTED BETWEEN TECHNICAL UNITS AND PRODUCTION LINES, UP TO A NEW MARKETING MODEL...
  • curprev 05:3805:38, 24 March 2020DG Regio talk contribs 8,750 bytes +433 Changed an Item

18 March 2020

12 March 2020

6 March 2020