Revision history of "SUPPRESSANTS INDUSTRIALISATION OF CAFFÃO MOKA" (Q2033446)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 16:2316:23, 7 October 2024DG Regio talk contribs 42,662 bytes +5 Changed label, description and/or aliases in pt
  • curprev 16:2316:23, 7 October 2024DG Regio talk contribs 42,657 bytes −17 Set a claim value: summary (P836): PROJECTO DE PLANOS DE INDUSTRIALIZAÇÃO PARA INDUSTRIALIZAR O SISTEMA DE EMBALAGEM DOS QUADROS, DE FORMA A TOTALIZAR O SEU FUNCIONAMENTO, E EFETUAR INVESTIMENTOS PARA COMPLETAR A PRIMEIRA LINHA DE PRODUÇÃO DOS QUADROS E INSTALAR UMA SEGUNDA LINHA COMPLETA, ALÉM DE EQUIPAMENTOS PARA PRODUÇÃO E EMBALAGEM.

23 March 2024

26 April 2023

8 April 2023

5 July 2022

  • curprev 04:4104:41, 5 July 2022DG Regio talk contribs 40,503 bytes +25,030 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

3 February 2022

24 January 2022

24 December 2021

23 December 2021

15 December 2021

2 November 2020

16 September 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 12:3312:33, 23 March 2020DG Regio talk contribs 8,979 bytes +697 Created claim: summary (P836): THE DRAFT INDUSTRIALISATION PLANS TO INDUSTRIALISE THE PACKAGING SYSTEM OF THE TABLETS, IN ORDER TO BE ABLE TO MAKE THIS SYSTEM FULLY OPERATIONAL, AND TO MAKE INVESTMENTS IN ORDER TO COMPLETE THE FIRST LINE OF PRODUCTION OF THE TABLETS AND TO SET UP A COMPLETE SECOND LINE, PLUS SOME EQUIPMENT FOR PRODUCTION AND PACKAGING., Adding English summary

20 March 2020

18 March 2020

12 March 2020

6 March 2020