Revision history of "TECHNICAL ADVICE FOR THE INNOVATION OF INLAND VESSELS" (Q2033364)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:4206:42, 9 October 2024DG Regio talk contribs 45,371 bytes −13 Changed label, description and/or aliases in pt
  • curprev 06:4206:42, 9 October 2024DG Regio talk contribs 45,384 bytes +19 Set a claim value: summary (P836): CARTUBI ESTÁ A PLANEAR A APLICAÇÃO DE UM NAVIO DE PASSAGEIROS INTERIOR (LAKES, RIVERS), EQUIPADO COM EQUIPAMENTOS INOVADORES DE PROPULSÃO/PROPULSÃO DIESEL, QUE NUNCA FOI INSTALADO ANTERIORMENTE NESTE TIPO DE NAVIOS EM ITÁLIA. O ING. GASPA PRESTA ACONSELHAMENTO ESPECÍFICO PARA A UTILIZAÇÃO DAS REGRAS E REGULAMENTAÇÕES RELATIVAS À CONSTRUÇÃO DOS NAVIOS DE PASSAGEIROS INTERNOS E À SUA APLICAÇÃO PRÁTICA DURANTE O PERÍODO DE VIDA DO PROJECTO.

7 March 2024

26 April 2023

8 April 2023

5 July 2022

  • curprev 04:3904:39, 5 July 2022DG Regio talk contribs 42,646 bytes +27,131 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

3 February 2022

24 January 2022

24 December 2021

23 December 2021

15 December 2021

2 November 2020

16 September 2020

8 June 2020

24 March 2020

  • curprev 23:1823:18, 24 March 2020DG Regio talk contribs 9,041 bytes +784 Created claim: summary (P836): CARTUBI IS PLANNING TO IMPLEMENT A INLAND PASSENGER SHIP (LAKES, RIVERS), EQUIPPED WITH INNOVATIVE PROPULSION/DIESEL PROPULSION EQUIPMENT, WHICH HAS NEVER PREVIOUSLY BEEN INSTALLED IN THIS TYPE OF SHIPS IN ITALY. THE ING. GASPA PROVIDES SPECIFIC ADVICE FOR THE USE OF THE RULES AND REGULATIONS FOR THE CONSTRUCTION OF INLAND PASSENGER VESSELS AND THEIR PRACTICAL APPLICATION DURING THE LIFETIME OF THE PROJECT., Adding English summary
  • curprev 05:3605:36, 24 March 2020DG Regio talk contribs 8,257 bytes +433 Changed an Item

19 March 2020

12 March 2020

6 March 2020