Revision history of "INTEGRATED COMPUTERISED SYSTEM FOR THE AUTOMATIC MANAGEMENT OF BUSINESS PROCESSES" (Q2032881)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:4206:42, 9 October 2024DG Regio talk contribs 47,944 bytes +1 Changed label, description and/or aliases in pt
  • curprev 06:4206:42, 9 October 2024DG Regio talk contribs 47,943 bytes −23 Set a claim value: summary (P836): O PROJETO ENVOLVE A APLICAÇÃO DE UM SISTEMA DE COMPUTADOR ESTRUTURADO PARA CONTROLO E GESTÃO DE TODOS OS PROCESSOS DE ATIVIDADE ATRAVÉS DE UM DADOS: PRODUÇÃO, GESTÃO DA INFORMAÇÃO, ARMAZENAMENTO E APOIO, SISTEMA ERP. O SISTEMA DE INTERFACE ENTRE O DADOS E AS ZONAS DE ATIVIDADES SERÁ CONSTRUÍDO PELOS DOMÍNIOS EM QUE AS MÁQUINAS E LINHAS DE PRODUÇÃO INDIVIDUAL SERÃO ABRANGIDAS; TODOS OS QUADROS SERÃO CONECTADOS AOS OUTROS E AO DADOS POR FIBRA ÓTICA.

23 March 2024

11 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 04:2704:27, 5 July 2022DG Regio talk contribs 45,356 bytes +28,886 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

12 February 2022

10 February 2022

3 February 2022

24 January 2022

24 December 2021

23 December 2021

15 December 2021

2 November 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 12:3212:32, 23 March 2020DG Regio talk contribs 8,767 bytes +837 Created claim: summary (P836): THE PROJECT INVOLVES THE IMPLEMENTATION OF A STRUCTURED COMPUTER SYSTEM TO CONTROL AND MANAGE ALL BUSINESS PROCESSES THROUGH A DATACENTER: PRODUCTION, INFORMATION MANAGEMENT, STORAGE AND BACK-UP, ERP SYSTEM. A SYSTEM OF INTERFACE BETWEEN THE DATACENTER AND THE BUSINESS AREAS WILL BE BUILT BY MEANS OF FIELDS TO WHICH THE INDIVIDUAL MACHINES AND PRODUCTION LINES WILL BE COVERED; ALL FRAMEWORKS WILL BE CONNECTED TO EACH OTHER AND TO THE DATACER BY...

20 March 2020

18 March 2020

12 March 2020

6 March 2020