Revision history of "RESTRUCTURING OF SECONDARY AND NORMATIVE SCHOOL 1° G. ELRERO" (Q2031102)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:5104:51, 11 October 2024DG Regio talk contribs 46,367 bytes −1 Changed label, description and/or aliases in pt
  • curprev 04:5104:51, 11 October 2024DG Regio talk contribs 46,368 bytes −5 Set a claim value: summary (P836): ESTE PROJECTO INCLUIRÁ, PARA TODA A ESCOLA SECUNDÁRIA DE 1° G. ELRERO, ADAPTAÇÃO AOS CRITÉRIOS E LEGISLAÇÃO RELATIVA ÀS POUPANÇAS ENERGÉTICAS DESTINADAS A MELHORAR O DESEMPENHO DA EFICIÊNCIA ENERGÉTICA DA PRESENTE ZONA: — INSULAÇÃO DE CABEÇAS COM PAINÉIS ISOTEC (A, B, C) — INSULAÇÃO DE PAINÉIS EXTERIORES COM LÃ DE ROCHA (ORGANISMOS A, B) — INSULAÇÃO DE PAINÉIS INTERIORES COM LÃ DE PEDRA (ORGANISMO C) — INSTALAÇÃO DE NOVAS FRAMAS DE VESTUÁRIO

7 March 2024

11 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 03:4503:45, 5 July 2022DG Regio talk contribs 43,256 bytes +27,458 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

3 February 2022

24 January 2022

24 December 2021

23 December 2021

15 December 2021

29 December 2020

2 November 2020

17 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 08:4508:45, 23 March 2020DG Regio talk contribs 8,709 bytes +792 Created claim: summary (P836): THIS PROJECT WILL INCLUDE, FOR WHOLE UPPER SECONDARY SCHOOL OF 1° G. ELRERO, ADAPTATION TO THE CRITERIA AND LEGISLATION ON ENERGY SAVINGS AIMED AT IMPROVING THE ENERGY EFFICIENCY PERFORMANCE OF THIS ZONE BY: — INSULATING OF HEDGES WITH ISOTEC PANELS (A, B, C) — INSULATION OF OUTER WALLS WITH ROCK WOOL (BODIES A, B) — INSULATION OF INSIDE WALLS WITH STONE WOOL (BODY C) — INSTALLATION OF NEW WINDOW FRAMES, Adding English summary

17 March 2020

12 March 2020

6 March 2020