Revision history of "PLANT WORKS AT THE PRIMARY AND SECONDARY SCHOOL OF SAN LEONARDO FOR REDUCTION" (Q2031101)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

11 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 03:4503:45, 5 July 2022DG Regio talk contribs 44,295 bytes +28,088 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

3 February 2022

24 January 2022

24 December 2021

23 December 2021

15 December 2021

29 December 2020

2 November 2020

17 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 08:4508:45, 23 March 2020DG Regio talk contribs 9,292 bytes +838 Created claim: summary (P836): IT IS ENVISAGED TO SET UP A COAT ON ALL THE EDGE WALLS AND TO INSULATE INSIDE THE INNER SIDE WITH ROCK WOOL, WHICH HAS TO BE LOCATED ABOVE THE EXISTING SUSPENDED CEILING, AND OF THE INSULATION OF THE ENVELOPE OF THE FLOOR OF THE FLOOR ZONE IN THE ZONE WHERE THE DUCTS ARE PASSED OR IN THE UNHEATED FLOOR TO THE LAND; IT IS EXPECTED THAT WINDOWS OF FACADE AND WINDOWS WILL BE REPLACED IN GENERAL AND THAT THE INSTALLATION OF SCREEN SHADING SYSTEMS WI...

20 March 2020

17 March 2020

12 March 2020

6 March 2020