Revision history of "ENERGY UPGRADING WORK OF THE MUNICIPAL SCHOOL BUILDING" (Q2023512)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 19:1819:18, 8 October 2024DG Regio talk contribs 45,115 bytes +2 Changed label, description and/or aliases in pt
  • curprev 19:1819:18, 8 October 2024DG Regio talk contribs 45,113 bytes −1 Set a claim value: summary (P836): NO EDIFÍCIO MUNICIPAL: COBERTURA DE EPS COM CHAPAS EM EPS, INSULAÇÃO COMPLETA DO PAVIMENTO DO PAVIMENTO COM CHAPAS EM EPS, INSULAÇÃO DE PAVILHAS VERTICAIS EXTERNAS COM CHAPAS EM EPS, SUBSTITUIÇÃO DE FRAMAS DE Vidro ALUMÍNIO EXISTENTES COM FRAMAS DE VESTUÁRIO EM PVC, PLANTA TÉRMICA COM FAVOR DE CALOR INVERTER, PAINEL DE PLANO RADIANTE PARA AQUECIMENTO E ARrefecimento, INSTALAÇÃO DE EQUIPAMENTO DE ILUMINAÇÃO LED (FORMER O.O.3.3)

7 March 2024

12 June 2023

26 April 2023

8 April 2023

5 July 2022

  • curprev 01:1401:14, 5 July 2022DG Regio talk contribs 41,994 bytes +26,513 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

10 February 2022

24 January 2022

24 December 2021

23 December 2021

14 December 2021

2 November 2020

15 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 09:4109:41, 23 March 2020DG Regio talk contribs 8,674 bytes +767 Created claim: summary (P836): IN THE MUNICIPALITY BUILDING: EPS COVER WITH PLATES IN EPS, FULL INSULATION OF THE FLOOR OF THE FLOOR WITH PLATES IN EPS, INSULATION OF OUTER VERTICAL WALLS WITH PLATES IN EPS, REPLACEMENT OF EXISTING ALUMINIUM WINDOW FRAMES WITH PVC WINDOW FRAMES, THERMAL POWER PLANT WITH INVERTER HEAT PUMP, RADIANT FLAT PANEL FOR HEATING AND COOLING, INSTALLATION OF LED LIGHTING EQUIPMENT (FORMER O.O.3.3), Adding English summary

20 March 2020

17 March 2020

12 March 2020

6 March 2020